Samarcand Training Academy – Full Sitework for a Police Academy

📍 Moore County, North Carolina

Project Overview

Hurley’s Earthworx was entrusted with the full sitework for the Samarcand Training Academy, a police academy in Moore County, NC. This project required a comprehensive site preparation package, including land clearing, erosion control, grading, and utility installations, to ensure the site was ready for the academy’s construction.

The site presented unique challenges, such as installing essential stormwater management and a septic system for wastewater handling, but our team’s precision and expertise ensured the project moved forward smoothly and on time.

Scope of Work

Erosion Control & Tree Protection – Installed 300 feet of erosion control measures and tree protection to prevent environmental damage during the site preparation process.

Fine Grading – Fine-graded the building pad, curb, and gutter, ensuring precise elevations for proper drainage and smooth construction.

Stormwater Management – Installed 200 linear feet of 8-12 inch HDPE storm drain to handle site runoff and prevent water accumulation.

Septic System Installation – Installed a 1,500-gallon septic tank and a 1,800-gallon pump tank, followed by 300 feet of leech field, providing a sustainable solution for wastewater management.

Challenges & Solutions

🚧 Challenge: Managing Site Erosion & Protecting Natural Features
💡 Solution: We implemented 300 feet of erosion control fencing and tree protection to prevent soil erosion and preserve the natural landscape, ensuring compliance with environmental regulations.

🚧 Challenge: Complex Septic System Installation
💡 Solution: Designed and installed a reliable septic and pump system to handle the academy’s wastewater needs, ensuring proper drainage and long-term functionality, even in the absence of municipal sewer lines.

🚧 Challenge: Ensuring Proper Drainage Across the Site
💡 Solution: Our team expertly installed stormwater drainage systems to manage water runoff, avoiding future flooding or pooling while protecting the surrounding environment.

Results & Impact

Efficient Site Preparation – Delivered accurate grading, tree protection, and erosion control, ensuring smooth progression toward building construction.
Sustainable Wastewater Management – Installed a reliable septic system that meets the academy’s needs and environmental standards.
Optimized Stormwater Flow – Managed drainage issues with efficient stormwater systems, providing long-term protection against water damage.

The Samarcand Training Academy project is an excellent example of Hurley’s Earthworx’s ability to handle complex sitework challenges with a customer-focused approach. By ensuring precision in grading and delivering sustainable utility solutions, we prepared the site for this important community resource, setting the stage for a safe and effective training environment.

Our Gallery