📍 Southern Pines, North Carolina
Project Overview
Hurley’s Earthworx was selected to complete the full sitework package for Twenty Fore Golf, an indoor golf facility in Southern Pines, NC. This project required land clearing, erosion control, excavation, fine grading, and utility installations to create a stable and well-prepared foundation for the new facility.
With precise excavation and grading, extensive underground stormwater management, and critical water and sewer installations, we ensured the site was fully prepped to support the facility’s long-term success.
Scope of Work
✅ Erosion Control & Tree Protection – Installed 500 feet of erosion control measures to prevent runoff and protect surrounding vegetation.
✅ Land Clearing & Grubbing – Cleared and grubbed 1.5 acres of land to make way for site development while ensuring proper environmental management.
✅ Mass Excavation & Grading – Completed a 7-foot mass cut of 2,166 cubic yards, ensuring the land was properly reshaped and leveled for construction.
✅ Fine Grading – Precisely graded the building pad, curb, and gutter, creating a solid foundation for smooth construction.
✅ Stormwater Management – Installed a 580-linear-foot, 48-inch CMP underground detention system to handle stormwater efficiently and prevent site flooding.
✅ Water Utility Installation – Tapped into an 8-inch water main and installed new water lines to serve the facility.
✅ Sewer System Installation – Installed 160 feet of 4-inch gravity sewer to connect the site to the municipal sewer main.
Challenges & Solutions
🚧 Challenge: Managing Erosion & Site Stability
💡 Solution: Implemented advanced erosion control measures, including tree protection and silt fencing, to prevent runoff and soil displacement.
🚧 Challenge: Precise Excavation & Grading Requirements
💡 Solution: Used GPS-guided excavation equipment to ensure accurate grading and minimize rework, keeping the project on schedule.
🚧 Challenge: Installing Underground Utilities Without Disrupting Project Flow
💡 Solution: Coordinated closely with contractors and utility providers to install stormwater, water, and sewer systems efficiently, avoiding costly delays.
Results & Impact
✅ On-Time & On-Budget Completion – Efficient planning and execution ensured smooth project delivery within schedule and cost expectations.
✅ Stable, High-Quality Sitework – Our expert grading and stormwater solutions provided a solid foundation for the new facility.
✅ Seamless Utility Integration – Water, sewer, and stormwater systems were installed and connected without issue, ensuring long-term functionality.
The Twenty Fore Golf project is a prime example of Hurley’s Earthworx’s commitment to precision, efficiency, and quality craftsmanship. By combining advanced excavation technology with a customer-focused approach, we delivered a site fully prepared for this premier indoor golf experience.